Shamancycle – The Stage is Set

Uh, the stage is built! Loads of progress this weekend. Finished grinding on and welding in the final three seat posts. Added some vertical posts topped with angle iron for the stage. Added side supports for the driver area, and got a good start on the u-joint and support for the steering. Glenn joined in on the fun and got in some good welds today. I spent part of Saturday using Nik’s lathe to cut an adapter between the rear axle spline and the 3/4″ drive shaft. That’s what the lower left image is.27MayUpdatePhoto

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.